Plan Preventive Maintenance And Raise Work Orders
Equipment that is serviced on a plan breaks down less than equipment that is fixed only when it fails. This guide covers both halves of keeping an asset healthy: preventive maintenance — servicing on a recurring schedule before anything goes wrong — and work orders — the tracked job you raise to actually carry out a service or fix a fault. A work order records the job, who it is on, its priority and target, the engineer visits against it, and the cost.
Who / when: the asset manager owns the maintenance lifecycle — creating schedules, raising work orders, and logging visits. Plan schedules when an asset is commissioned; raise work orders whenever something is due or has failed.
We will follow Emeka the biomedical engineer, keeping the lab’s analyzers in service.
Set a preventive-maintenance schedule
Section titled “Set a preventive-maintenance schedule”A preventive-maintenance schedule (PM schedule) tells Veona when an asset is next due for routine servicing and reminds you ahead of time.
- Asset manager — open Assets → Maintenance. It has two sub-tabs: PM Schedules and Work Orders. Stay on PM Schedules.
- Asset manager — press “New Schedule”.
- Asset manager — choose the Asset (search the register), give the schedule a Name (e.g. “Quarterly Preventive Service”), and pick a Type (Preventive, Corrective, Calibration or Inspection).
- Asset manager — choose the Basis:
- Calendar — recurs on a time interval. Set Every n and a Unit (Day, Week, Month, Year), e.g. every 3 Months.
- Usage Hours — recurs on accumulated runtime. Set Every (Runtime Hours), e.g. every 500 hours — useful for equipment whose wear tracks usage, not the calendar.
- Asset manager — optionally set a First Due date, an Assign To (search staff), and the Reminder Lead Days — a comma-separated list (e.g.
30,7,1) of how many days before the due date a reminder fires. - Asset manager — press “Create”. The schedule lists with its next due date, colour-coded as it approaches.
Raise and work a work order
Section titled “Raise and work a work order”- Asset manager — on Assets → Maintenance, open the Work Orders sub-tab and press “Raise Work Order”.
- Asset manager — choose the Asset and a Title (e.g. “Centrifuge not reaching speed”). Set the Type, the Priority (Low, Normal, High, Critical), an optional Description, an Assign To, and an optional SLA Due date.
- Asset manager — press “Raise”. The work order lists with its number, priority and cost (zero until visits are logged).
- Asset manager — click the work order’s row to open it, then “Start” to move it to In Progress (you can also put it On Hold or Cancel it).
- Asset manager — under Add A Visit, record each attendance: the Visit Date, the Engineer (a staff member) or a free-text Vendor Engineer, the Labour Hours, the Parts Cost and any Notes. Press “Add Visit”. Visits accumulate on the work order and their parts costs roll into its total.
- Asset manager — when the job is done, press “Complete”.
What happens next
Section titled “What happens next”A completed work order shows its final cost and any resolution note; its visits remain as the service history for the asset. Schedules roll their next-due date forward. The dashboard’s Open Work Orders and PM Due Soon tiles update, and any downtime the repair resolved is closed out automatically.